![]() |
subject > change > change to requirements |
![]() ![]() | ||||
change to requirements | ||||
subject | fact |
change to requirements | can result in a deteriorating design if the original design did adequately anticipate the changes | ![]() |
can result in completed work being wasted | ![]() | |
can be rapid | ![]() | |
can cause requirements creep | ![]() | |
has unpredictable rate | ![]() | |
is a subtopic of 4.9 - Managing Changing Requirements | ![]() | |
is a kind of change | ![]() | |
should not make the system bigger | ![]() | |
should only be made if benefits exceed the costs | ![]() |